GRAI Retrospective Model
Four-Step Template
Retrospective Topic: 618 Mid-Year Sale Campaign Retrospective
Retrospective Date: 2026-06-25
Participants: Operations team, Product team, Design team, Engineering team
| GRAI Four-Step Method | My Notes & Answers |
|---|---|
| Goal — Review Goals • What is the purpose goal? • What is the task goal (quantified)? • What is the action goal (method)? |
Purpose goal: Boost brand influence through 618 sale, acquire and reactivate users, lay foundation for H2 growth Task goal: GMV reach $5M, 20K new users, 8% campaign conversion rate Action goal: Prepare 1 month in advance, 3 rounds of pre-heat, main venue + sub-venue format, partner with 5 brand collaborators |
| Result — Evaluate Results • Completion of purpose / task / action goals? • 1-3 highlights in process / results? • 1-3 shortcomings in process / results? |
Goal completion: GMV $6.2M (124%), 23K new users (115%), 9.2% conversion rate (115%) Highlights: 1. First attempt at live-stream commerce, contributed 30% of GMV, exceeded expectations 2. Existing user repurchase rate reached 35%, indicating improving user stickiness 3. Cross-department collaboration was smoother than last year; no last-minute requirement changes like before Shortcomings: 1. Server crashed for 20 minutes on the first day, estimated loss around $20K GMV 2. Some product inventory was inaccurately estimated, best-sellers sold out early 3. Customer support couldn't keep up; user complaints tripled from usual |
| Analysis — Root Cause Analysis • What caused success? • What caused failure? • Which analysis method was used? |
Success reasons: 1. Precise product selection for live stream, high host cooperation, plus platform traffic support (main factor) 2. Pre-planned re-engagement campaign for existing users, reactivated a group of dormant users 3. Started stress testing and full-link rehearsal 2 weeks early; overall stability much better than last year Failure reasons: 1. Server capacity estimation was too conservative; prepared for 1.5x last year's peak, but actual traffic was 2.3x (live-stream traffic exceeded expectations) 2. Inventory forecast model only referenced last year's data, didn't account for live-stream uplift 3. Customer support team only added 2 staff, insufficient estimation Analysis method: ☑ 5 Whys Analysis □ Fishbone diagram □ SWOT analysis □ Other: |
| Insight — Lessons Learned • What methodologies / SOPs can be documented? • What Q&As can be compiled? |
Methodology / SOP: 1. Full-link stress testing SOP before big sales (documented) 2. Live-stream product selection and operations SOP (validated effective this time) 3. Cross-department collaboration mechanism (weekly meeting + daily standup + real-time chat group) Q&A: Q: How to estimate server capacity for big sales? A: Reference historical peak × 2x, multiply by another 1.5x if there's a new traffic channel (e.g., live-stream). It's better to over-prepare than under-prepare. Q: What if inventory forecast is inaccurate? A: Phased stock — 60% in first batch, replenish dynamically based on first 2 days' sales data, agree on 48-hour replenishment mechanism with suppliers. Q: How to estimate customer support staffing? A: Prepare 3-5x usual staffing; also prepare auto-reply scripts and FAQ to improve efficiency. |
G — Goal Review
Purpose Goal
Why are we doing this? What is the underlying purpose and meaning?
Achieve three objectives through the 618 mid-year sale:
- Drive performance, hit 40% of H1 GMV target
- Acquire new users through promotional discounts
- Brand exposure, increase industry visibility
Task Goal (Quantified)
What specific measurable results are to be achieved?
| Metric | Target | Unit |
|---|---|---|
| GMV | 500 | $10K (5M) |
| New users | 20 | K users |
| Conversion rate | 8 | % |
| AOV | 200 | $ |
Action Goal (Method)
What methods and paths are planned to achieve the goals?
- Launch preparation 1 month early, establish cross-department task force
- 3 rounds of pre-heat: Blog post → Community referral → Splash-screen ads
- Main venue + 5 themed sub-venues
- First attempt at live-stream commerce: 2 sessions daily, invite 3 top influencers
- Partner with 5 brand collaborators for joint promotion
R — Result Evaluation
Goal Completion
| Goal type | Target | Actual | Completion | Score |
|---|---|---|---|---|
| Purpose goal | Hit 40% of H1 target | Hit 48% of H1 target | 120% | ⭐⭐⭐⭐⭐ |
| Task goal | GMV $5M | GMV $6.2M | 124% | ⭐⭐⭐⭐⭐ |
| Action goal | Execute as planned | Mostly on plan, live-stream effect exceeded expectations | 110% | ⭐⭐⭐⭐ |
Highlights (1-3)
- Live-stream exceeded expectations: Contributed 30% of GMV — the biggest pleasant surprise of this campaign, validated the feasibility of live-stream e-commerce
- High existing user repurchase rate: Reached 35%, indicating daily user operations are working and user stickiness is improving
- Smooth cross-department collaboration: No chaotic situations like last year; advance rehearsal and clear division of labor worked
Shortcomings (1-3)
- Server downtime: Server crashed for 20 minutes at 10:00 on day one; conservative estimate $20K GMV loss, also damaged user experience
- Best-sellers out of stock: TOP 3 products sold out 2 days early; traffic came later but nothing to sell — estimated loss $15K
- Customer support lagged: User wait time went from 30 seconds usual to 5 minutes; complaints tripled, damaging brand reputation
A — Analysis
Success Reasons
| Reason | Type | Contribution |
|---|---|---|
| Precise live-stream product selection + platform traffic support | Combined objective+subjective | ⭐⭐⭐⭐⭐ |
| Well-planned existing user re-engagement, reactivated dormant users | Subjective | ⭐⭐⭐⭐ |
| Advance rehearsal, mature cross-department collaboration | Subjective | ⭐⭐⭐⭐ |
Failure Reasons
| Reason | Type | Impact |
|---|---|---|
| Server capacity estimate too conservative; didn't account for live-stream uplift traffic | Subjective (insufficient experience) | 🔴 High |
| Inventory forecast only referenced historical data, no new variable model | Subjective (methodology issue) | 🟡 Medium |
| Insufficient support staffing; misjudged campaign scale | Subjective (inaccurate estimate) | 🟡 Medium |
5 Whys Deep Dive (Optional)
Problem: Why did the server crash?
→ Because traffic peak exceeded server capacity
→ Why did traffic exceed?
→ Because live-stream brought far more traffic than expected
→ Why wasn't live-stream traffic anticipated?
→ Because there was no live-stream last year, no historical data to reference
→ Why not make a more conservative estimate?
→ Because of cost concerns, wanted "just enough" — and it backfired
→ Root cause: Insufficient traffic risk assessment for new channels; capacity strategy too conservative. Should be "better to over-prepare than under-prepare"
I — Insight
Reusable Methodology / SOP
Methods that can be reused next time:
- Big sale full-link stress testing SOP — Start 2 weeks early, at least 3 rounds
- Live-stream product selection and operations SOP — Selection criteria, host coordination, traffic handling
- Cross-department collaboration mechanism — Weekly meeting + daily standup + real-time chat group + clear RACI
Processes to formalize:
- Step 1: 1 month before sale, complete all plan reviews and resource confirmation
- Step 2: 2 weeks before sale, begin full-link stress testing and simulation rehearsal
- Step 3: 1 week before sale, all staff on standby, do final checks
- Step 4: During sale, daily retrospective, quickly adjust strategy
- Step 5: Within 1 week after sale, complete full retrospective document
Q&A Compilation
| Q Question | A Answer | Applicable scenario |
|---|---|---|
| How to estimate server capacity? | Historical peak × 2, × 1.5 more if new channels exist | All large-scale promotions |
| How much inventory to stock? | 60% in first batch, replenish based on real-time data | E-commerce campaigns |
| How to staff customer support? | 3-5x usual, prepare auto-replies | All large-scale events |
| How to handle live-stream traffic? | Prepare landing pages in advance, ensure server can handle | Live-stream commerce scenarios |
Action Plan
| Action Item | Owner | Deadline | Priority | Status |
|---|---|---|---|---|
| Compile big sale SOP document, company-wide rollout | Ops lead | 2026-07-10 | 🔴 High | ⬜ |
| Upgrade server capacity strategy, introduce auto-scaling | Eng lead | 2026-07-15 | 🔴 High | ⬜ |
| Build intelligent inventory forecast model | Data team | 2026-08-01 | 🟡 Medium | ⬜ |
| Expand support team + establish flexible staffing mechanism | HR + Support lead | 2026-07-31 | 🟡 Medium | ⬜ |
| Validate improvements during Double 11 retrospective | All | 2026-11-20 | 🟢 Low | ⬜ |
📌 Quick Reference Card
| Letter | Chinese | English | Core Question |
|---|---|---|---|
| G | Review goals | Goal | What was the original goal? |
| R | Evaluate results | Result | How did actual results turn out? Highlights and shortcomings? |
| A | Root cause analysis | Analysis | Why did it succeed / fail? What's the root cause? |
| I | Lessons learned | Insight | What was learned? How to do better next time? |